{"id":2129,"date":"2018-12-22T08:18:10","date_gmt":"2018-12-22T07:18:10","guid":{"rendered":"http:\/\/beta.kannewischer.group\/?p=2129"},"modified":"2021-01-18T09:54:28","modified_gmt":"2021-01-18T08:54:28","slug":"ageribad-oberageri","status":"publish","type":"post","link":"https:\/\/www.kannewischer.group\/en\/2018\/12\/ageribad-oberageri\/","title":{"rendered":"\u00c4geribad, Ober\u00e4geri"},"content":{"rendered":"\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h1 class=\"project wp-block-heading\">\u00c4geribad, Ober\u00e4geri<\/h1>\n\n\n\n<div class=\"wp-block-columns project is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1110\" height=\"740\" src=\"https:\/\/www.kannewischer.group\/wp-content\/uploads\/Bild-\u00c4geribad.jpg\" alt=\"\" class=\"wp-image-2125\" srcset=\"https:\/\/www.kannewischer.group\/wp-content\/uploads\/Bild-\u00c4geribad.jpg 1110w, https:\/\/www.kannewischer.group\/wp-content\/uploads\/Bild-\u00c4geribad-800x533.jpg 800w, https:\/\/www.kannewischer.group\/wp-content\/uploads\/Bild-\u00c4geribad-768x512.jpg 768w\" sizes=\"auto, (max-width: 1110px) 100vw, 1110px\" \/><\/figure>\n\n\n\n<p>Prompted by the question of an indoor swimming pool for swimming lessons in the Aegeri valley, a family and adventure pool was created that also covers the needs of water sports. A pool for schools, swimming enthusiasts, clubs, families, people of all ages and wellness enthusiasts has been created.<\/p>\n\n\n\n<p>In addition to a 25m pool with 8 lanes, the facility also has a multifunctional pool with a lifting floor and a paddling pool. Furthermore, a heated outdoor pool with massage beds and a large tube slide was realized.<\/p>\n\n\n\n<p>The wellness area with various saunas as well as relaxation and massage rooms, was designed as an independent unit.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\">\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Owner<\/strong><\/p>\n\n\n\n<p>\u00c4geribad AG<br>CH-6515 Ober\u00e4geri<\/p>\n\n\n\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Architect<\/strong><\/p>\n\n\n\n<p>Scheitlin Syfrig Architekten<br>CH-6004 Luzern<\/p>\n\n\n\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Period<\/strong><\/p>\n\n\n\n<p>Realisation 2016-2018<\/p>\n\n\n\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Nature of the building project<\/strong><\/p>\n\n\n\n<p>New building<\/p>\n\n\n\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Type of building<\/strong><\/p>\n\n\n\n<p>Swimming pool<\/p>\n\n\n\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Our services<\/strong><\/p>\n\n\n\n<ul class=\"is-style-list-carets-blue wp-block-list\"><li>Technical planning for heating, ventilation, sanitary, pool water systems, building automation and stainless steel basin<\/li><li>Construction management for heating, ventilation, sanitary, pool water systems, building automation and stainless steel basin<\/li><li>Coordination of the house technique facilities<\/li><\/ul>\n\n\n\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Trades<\/strong><\/p>\n\n\n\n<p class=\"icon mb-0\">Heating<\/p>\n\n\n\n<p class=\"icon mb-0\">Ventilation<\/p>\n\n\n\n<p>Sanitary<\/p>\n\n\n\n<p>Pool water systems<\/p>\n\n\n\n<p>Building automation<\/p>\n\n\n\n<p>Stainless steel basin<\/p>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kannewischer | 2016-2018 | <a class=\"understrap-read-more-link\" href=\"https:\/\/www.kannewischer.group\/en\/2018\/12\/ageribad-oberageri\/\">Read More<\/a><\/p>\n","protected":false},"author":1341,"featured_media":2125,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[53,55],"tags":[],"class_list":["post-2129","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-references","category-swimming-pools"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/posts\/2129","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/users\/1341"}],"replies":[{"embeddable":true,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/comments?post=2129"}],"version-history":[{"count":2,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/posts\/2129\/revisions"}],"predecessor-version":[{"id":2395,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/posts\/2129\/revisions\/2395"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/media\/2125"}],"wp:attachment":[{"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/media?parent=2129"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/categories?post=2129"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/tags?post=2129"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}