{"id":2217,"date":"2012-12-22T09:17:26","date_gmt":"2012-12-22T08:17:26","guid":{"rendered":"http:\/\/beta.kannewischer.group\/?p=2217"},"modified":"2021-01-18T10:16:37","modified_gmt":"2021-01-18T09:16:37","slug":"fitness-park-allmend-luzern","status":"publish","type":"post","link":"https:\/\/www.kannewischer.group\/en\/2012\/12\/fitness-park-allmend-luzern\/","title":{"rendered":"Fitness Park Allmend, Luzern"},"content":{"rendered":"\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h1 class=\"project wp-block-heading\">Fitness Park Allmend, Luzern<\/h1>\n\n\n\n<div class=\"wp-block-columns project is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1110\" height=\"740\" src=\"https:\/\/www.kannewischer.group\/wp-content\/uploads\/Bild-Fitnesspark-Luzern.jpg\" alt=\"\" class=\"wp-image-2218\" srcset=\"https:\/\/www.kannewischer.group\/wp-content\/uploads\/Bild-Fitnesspark-Luzern.jpg 1110w, https:\/\/www.kannewischer.group\/wp-content\/uploads\/Bild-Fitnesspark-Luzern-800x533.jpg 800w, https:\/\/www.kannewischer.group\/wp-content\/uploads\/Bild-Fitnesspark-Luzern-768x512.jpg 768w\" sizes=\"auto, (max-width: 1110px) 100vw, 1110px\" \/><\/figure>\n\n\n\n<p>After a construction period of only eight months, the Allmend Fitness Park in Lucerne was opened at the beginning of August 2012. It is another Migros facility which combines health, fun and wellness in an ideal way.<\/p>\n\n\n\n<p>The extensive wellness and fitness facilities are located on the 5th floor of the Allmend sports building and include a large fitness arena, two saunas &#8211; one mixed and one specially for women only &#8211; a Kneipp garden in the inner courtyard, a large salt lounge, a medical centre and of course cloakrooms, showers and other rooms for reception, administration and consultations. The associated technical equipment is located one floor below.<\/p>\n\n\n\n<p>The already constructed building has a special static concept, which had to be taken into account when the fitness park was built. It was a particular challenge for all those involved to plan and install the necessary technical equipment under the given conditions.<\/p>\n\n\n\n<p><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\">\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Owner<\/strong><\/p>\n\n\n\n<p>Genossenschaft Migros Luzern<br>CH-6031 Ebikon<\/p>\n\n\n\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Architect<\/strong><\/p>\n\n\n\n<p>Sulzer + Buzzi AG<br>CH-6312 Steinhausen-Zug<\/p>\n\n\n\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Period<\/strong><\/p>\n\n\n\n<p>Realisation 2010-2012<\/p>\n\n\n\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Nature of the building project<\/strong><\/p>\n\n\n\n<p>Renovation<\/p>\n\n\n\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Type of building<\/strong><\/p>\n\n\n\n<p>Swimming pool, Fitness<\/p>\n\n\n\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Our services<\/strong><\/p>\n\n\n\n<ul class=\"is-style-list-carets-blue wp-block-list\"><li>Technical planning for heating, ventilation, sanitary, pool water systems and kneipp basin<\/li><\/ul>\n\n\n\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Trades<\/strong><\/p>\n\n\n\n<p>Heating<\/p>\n\n\n\n<p>Ventilation<\/p>\n\n\n\n<p>Sanitary<\/p>\n\n\n\n<p>Pool water systems<\/p>\n\n\n\n<p><\/p>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kannewischer | 2010-2012 |  <a class=\"understrap-read-more-link\" href=\"https:\/\/www.kannewischer.group\/en\/2012\/12\/fitness-park-allmend-luzern\/\">Read More<\/a><\/p>\n","protected":false},"author":1341,"featured_media":2219,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[53,55],"tags":[],"class_list":["post-2217","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-references","category-swimming-pools"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/posts\/2217","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/users\/1341"}],"replies":[{"embeddable":true,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/comments?post=2217"}],"version-history":[{"count":2,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/posts\/2217\/revisions"}],"predecessor-version":[{"id":2405,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/posts\/2217\/revisions\/2405"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/media\/2219"}],"wp:attachment":[{"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/media?parent=2217"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/categories?post=2217"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/tags?post=2217"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}