{"id":2257,"date":"2010-12-22T09:31:37","date_gmt":"2010-12-22T08:31:37","guid":{"rendered":"http:\/\/beta.kannewischer.group\/?p=2257"},"modified":"2021-01-25T09:15:09","modified_gmt":"2021-01-25T08:15:09","slug":"outdoor-pool-olten-olten","status":"publish","type":"post","link":"https:\/\/www.kannewischer.group\/en\/2010\/12\/outdoor-pool-olten-olten\/","title":{"rendered":"Outdoor Pool Olten, Olten"},"content":{"rendered":"\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h1 class=\"project wp-block-heading\">Energetic renovation outdoor pool Olten, Olten<\/h1>\n\n\n\n<div class=\"wp-block-columns project is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.kannewischer.group\/wp-content\/uploads\/Bild-Freibad-Olten.jpg\" alt=\"\" class=\"wp-image-2254\" srcset=\"https:\/\/www.kannewischer.group\/wp-content\/uploads\/Bild-Freibad-Olten.jpg 1024w, https:\/\/www.kannewischer.group\/wp-content\/uploads\/Bild-Freibad-Olten-800x600.jpg 800w, https:\/\/www.kannewischer.group\/wp-content\/uploads\/Bild-Freibad-Olten-768x576.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>After the flood of 2007, a new solution using renewable energy had to be found for the then provisionally installed gas heating system, since today&#8217;s energy legislation prohibits the heating of outdoor swimming pools with fossil energy.<\/p>\n\n\n\n<p>In the middle of 2008, a preliminary study for a corresponding energy-efficient renovation was drawn up. In January 2009 the final project planning and implementation was realised and the system was ready for operation again at the beginning of the 2010 bathing season.<\/p>\n\n\n\n<p>The energetic renovation includes the following measures:<\/p>\n\n\n\n<ul class=\"is-style-list-carets-blue wp-block-list\"><li>Pool heating through a river water heat pump<\/li><li>Pool cover to avoid heat loss due to evaporation<\/li><li>Solar water heating for showers in the building of the cloakrooms<\/li><\/ul>\n\n\n\n<p>The total energy saving of all measures corresponds to approx. 50&#8217;000 l heating oil per season. The river water collection was also designed with up to 400 m3 \/h (current withdrawal is 100 m3 \/h) for a possible indoor swimming pool or other users.<\/p>\n\n\n\n<p><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\">\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Owner<\/strong><\/p>\n\n\n\n<p>Stadt Olten<br>CH-4600 Olten<\/p>\n\n\n\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Period<\/strong><\/p>\n\n\n\n<p>Realisation 2009-2010<\/p>\n\n\n\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Nature of the building project<\/strong><\/p>\n\n\n\n<p>Renovation<\/p>\n\n\n\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Type of building<\/strong><\/p>\n\n\n\n<p>Outdoor pool<\/p>\n\n\n\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Our services<\/strong><\/p>\n\n\n\n<ul class=\"is-style-list-carets-blue wp-block-list\"><li>Technical planning for the energetic renovation<\/li><li>Construction management for the energetic renovation<\/li><\/ul>\n\n\n\n<p class=\"mb-0 has-blue-color has-text-color\"><strong>Trades<\/strong><\/p>\n\n\n\n<p>Pool water systems<\/p>\n\n\n\n<p>Sun absorber<\/p>\n\n\n\n<p>Heat pump<\/p>\n<\/div>\n<\/div>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Kannewischer | 2009-2010 |  <a class=\"understrap-read-more-link\" href=\"https:\/\/www.kannewischer.group\/en\/2010\/12\/outdoor-pool-olten-olten\/\">Read More<\/a><\/p>\n","protected":false},"author":1341,"featured_media":2254,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[53,55],"tags":[],"class_list":["post-2257","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-references","category-swimming-pools"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/posts\/2257","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/users\/1341"}],"replies":[{"embeddable":true,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/comments?post=2257"}],"version-history":[{"count":2,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/posts\/2257\/revisions"}],"predecessor-version":[{"id":2512,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/posts\/2257\/revisions\/2512"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/media\/2254"}],"wp:attachment":[{"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/media?parent=2257"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/categories?post=2257"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.kannewischer.group\/en\/wp-json\/wp\/v2\/tags?post=2257"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}